Canton FairSourcing
Production Line

H-beam heavy duty production line

WUXI ZHOUXIANG COMPLETE SET OF WELDING EQUIPMENT CO., LTD
10/10 fairsManufacturerModel HZJ, XBH, YJZ, HGP
Smart product
H-beam heavy duty production line
$100$147,00000/ set FOB
MOQ 1 set
Estimated landed cost
$94,559 / set
range $15$189,098 · total ≈ $9,455,936
See what’s included
FOB goods (100)
$7,350,050
Ocean freight + handling (5.0 CBM, volume guessed from price)
$1,300
US duty (3.5%)
$257,252
Section 301 tariff (25.0%)
$1,837,513
Customs fees (MPF/HMF)
$9,822

Estimate in USD to a US port using category averages, rates as of 2026-09. Other countries on request. A quote from our desk uses real carton sizes, freight and the exact tariff line.

Verify from $29 · written report in 3 business days · 100% refund if unreachable

About this product

  • Materials: steel, aluminum, rubber and iron
  • Size: 75000*15000*4120mm
  • Color: Zhouxiang standard blue
  • Exports to: Mainland China, Africa, Middle East, Southeast Asia, South Asia, Central Asia, USA and Canada, Latin America, Russia, EU, Other European Countries, Japan and South Korea, Hong Kong China, Macao China and Taiwan China, Others
  • Made in: Jiangsu, China
Product details
Materialssteel, aluminum, rubber and iron
Size75000*15000*4120mm
ColorZhouxiang standard blue
From the supplier

As a highly automatic H-beam production line, Heavy-duty steel production line sees reducing the use frequency of overhead crane as its subject. Through using automatic machines as roller conveyor, turning machine and conveying machine to conveying, turning and moving H beam during welding process, which greatly improved user’s production efficiency. 

The General production process of heavy-duty steel production line as following:

Strip cutting- strip processing (joint—grooving)—T-beam assembling—H-beam assembling-- beam 90° turning–beam conveying-- beam moving-- beam 45 ° turning—welding by the first cantilever welder at the first welding section-- beam 45°returning – beam moving-- beam 45 ° turning --welding by the second welder at the first section-- beam 45 °returning -- Beam moving-- Beam conveying-- Beam 180 ° overturning-- Beam conveying-- Beam moving-- Beam turning 45°-- welding by the first cantilever welder at the second welding section-- Beam returning 45°-- Beam moving -- Beam overturning 45 ° --welding by the second cantilever welder at the second section  -- Beam returning 45° -- Beam moving -- Beam conveying-- Beam 90 ° overturning—the straightening of one flange -- Beam 180° overturning—the straightening of the other flange—welding of stiffened end-plates-- Beam’s secondary processing(Beam sawing – face milling-- Three-dimensional drilling)—shot blasting—painting.


Technical parameter 

Web height                       200~3000 mm

Web thickness                      6~60 mm

Flange width                       200-1000 mm

Flange thickness                    6~70 mm

Beam(Web/flange) length          4000~15000 mm

About the supplier

WUXI ZHOUXIANG COMPLETE SET OF WELDING EQUIPMENT CO., LTD

Main products: Other Welding Equipment,Rolling machine,Turning rolls,Edge milling machine,Other Metal Cutting Machinery,Other Large Machinery u0026 Equipment,H Beam production line,Pipe Cutting Tool,CNC Plasma Cutting Machines

  • Exhibited at 10 of the last 10 Canton Fairs
  • Manufacturer
  • Founded 2001
  • Canton Fair Premium Supplier
  • National high-tech enterprise
See all products from this supplier →
  • Exhibited at 10 of the last 10 Canton Fairs
  • Manufacturer
  • Founded 2001
  • Canton Fair Premium Supplier
Canton Fair booth: 19.1K12-14,19.1J33-35 · Large Machinery & Equipment (140th session)

Similar products from other suppliers

H beam production line
H beam production line
$65,000.00–$70,000.00 / unit FOB
~$86841.22 landed · 100 pcs
Light Steel-Frame Structure Production Line
New
Light Steel-Frame Structure Production Line
$5,000.00–$50,000.00 / unit FOB
~$35391.22 landed · 100 pcs
$1.00–$147000.00 / set
MOQ 1 · Verify for $29
Get a quote