
The supplier hasn’t listed a price. We can get their current prices and MOQ.
Verify from $29 · written report in 3 business days · 100% refund if not satisfied

The supplier hasn’t listed a price. We can get their current prices and MOQ.
Verify from $29 · written report in 3 business days · 100% refund if not satisfied
About this product
- Size: 28*28*22
- Color: Gray
- Application: IndustrialandMiningEnterprisesSchoolHotel
- Brand: Other
- Size: Small
- Usage: SVC
- Exports to: USA and Canada, EU, Japan and South Korea
About this product
- Size: 28*28*22
- Color: Gray
- Application: IndustrialandMiningEnterprisesSchoolHotel
- Brand: Other
- Size: Small
- Usage: SVC
- Exports to: USA and Canada, EU, Japan and South Korea
Product details
| Size | 28*28*22 |
|---|---|
| Color | Gray |
| Application | IndustrialandMiningEnterprisesSchoolHotel |
| Brand | Other |
| Size | Small |
| Usage | SVC |
| Frequency characteristics | PowerFrequency |
| Iron core shape | Ring |
| Power supply | LinearRegulatedPowerSupply |
| Current type | Other |
| Frequency | IndustrialFrequency |
| Phase | Other |
Product details
| Size | 28*28*22 |
|---|---|
| Color | Gray |
| Application | IndustrialandMiningEnterprisesSchoolHotel |
| Brand | Other |
| Size | Small |
| Usage | SVC |
| Frequency characteristics | PowerFrequency |
| Iron core shape | Ring |
| Power supply | LinearRegulatedPowerSupply |
| Current type | Other |
| Frequency | IndustrialFrequency |
| Phase | Other |
From the supplier
Under-voltage protection: When the output voltage is lower than 10% of the rated voltage, the output power supply will be cut off by 3-5 seconds delay; (Optional)Overvoltage protection: When the output voltage exceeds 10% of the rated voltage, the output power supply will be cut off with a delay of 3-5 seconds;
Short-circuit protection: cut off the input power supply when the load equipment is short-circuited;
Overcurrent Protection: 5 times the rated current for about 1 second
From the supplier
Under-voltage protection: When the output voltage is lower than 10% of the rated voltage, the output power supply will be cut off by 3-5 seconds delay; (Optional)Overvoltage protection: When the output voltage exceeds 10% of the rated voltage, the output power supply will be cut off with a delay of 3-5 seconds;
Short-circuit protection: cut off the input power supply when the load equipment is short-circuited;
Overcurrent Protection: 5 times the rated current for about 1 second
About the supplier
- ✓Exhibited at 10 of the last 10 Canton Fairs
- ✓Foreign Trade Company
- ✓Founded 2002
Light & Electrical exhibitors show in Phase 1 of the Canton Fair, 15 to 19 October 2026.
- Exhibited at 10 of the last 10 Canton Fairs
- Foreign Trade Company
- Founded 2002















