Satake Type Mnml50-Vta15 Vertical Emery Roller Rice Whitener
EZhou XingFang Grinding Tool Co.,LTD
The supplier hasn’t listed a price. We can get their current prices and MOQ.
Verify from $29 · written report in 3 business days · 100% refund if unreachable

Satake Type Mnml50-Vta15 Vertical Emery Roller Rice Whitener
EZhou XingFang Grinding Tool Co.,LTDThe supplier hasn’t listed a price. We can get their current prices and MOQ.
Verify from $29 · written report in 3 business days · 100% refund if unreachable
About this product
- Materials: Iron&steel
- Size: 1731X1460X2385
- Color: WHITE
- Exports to: Middle East, Southeast Asia, South Asia, Central Asia, USA and Canada, Latin America, Russia, EU, Other European Countries, Others
- Made in: Hubei, China
About this product
- Materials: Iron&steel
- Size: 1731X1460X2385
- Color: WHITE
- Exports to: Middle East, Southeast Asia, South Asia, Central Asia, USA and Canada, Latin America, Russia, EU, Other European Countries, Others
- Made in: Hubei, China
Product details
| Materials | Iron&steel |
|---|---|
| Size | 1731X1460X2385 |
| Color | WHITE |
Product details
| Materials | Iron&steel |
|---|---|
| Size | 1731X1460X2385 |
| Color | WHITE |
From the supplier
Ⅳ. Installation
1、Installation datum hole
Figure2. datum hole
2、The installation should be based on formation, firmly. Equipment installation at the end of 6-M16 foot pads correction with the level of Department to ensure that the level of the state machinery at the bottom, and then fastening nut anchor bolts.
3、 In order to facilitate maintenance and inspection, the machine is not less than four weeks should be 1m left of the space. 1.5m above the machinery space should be left in order to replace the bearings when the machine spindle can be removed from the top of the vertical. Figure 3.
Figure 3. Installation space of equipment
Ⅴ. The boot preparation
1, open the side of the machine base plate, according to the following checks:
(1) check the Triangle will be tight round the bolt, and each round of V-belt in the correct location.
(2) to check the degree of tension of the Triangle.
(3) Triangle with his hands moving slowly round plate, check whether indoor roller white foreign body, especially the metal debris. If so, be clear.
2, so that under no-load motor operation, according to the following checks:
(1) motor rotation direction, down from the previous observation, running clockwise Pulley.
(2) whether there is any abnormal noise machines and vibration.
(3) whether the overheated bearings throughout.
(4) whether the motor ammeter showed abnormal
3, air-conditioning
Equipment in the near vicinity of the wind pipe (see Figure 4), the user network to install wind suction bran should be made for air-flow valves. No-load test, the regulation of air volume, so that pressure gauge shows the value of the machine in the water column -100 ~-150mm range
Figure 4
Ⅵ. Operation
1, After the boot prepared , the startup procedures are as follows
Start bran-suction fan (be attention to the air volume)
2. Adjustment of the clearance in whitening room
The whitening pressure of whitening room in this machine is adjusted by the clearance between huller blade and sand roll ( Figure 5)
Figure 5. The clearance of huller blade and emery roll
Due to sand abrasion and the need to adjust the roll clearance can be removed to build the frame and the side cover, remove the screen and the framework (see Figure 6). Knob and then release the lock nut and rotating the knob to adjust the clearance between huller blade and sand roll. Increasing clearance clockwise rotation, counterclockwise rotation decreases clearance that can be used to check special 6mm feet measured (see Figure 7)
Figure 6. Adjustment of the clearance
Figure 7. Clearance measurement
Ⅶ. Repair and maintenance
1, regular cleaning of machine parts easily plot bran.
Parts
Cleaning period
Discharge hole
Everyday
Inside of covers
Weekly
Material outlet
Weekly
Bran-collection pipe
Monthly
2, periodic inspection machines easy to loose, wear parts, mainly in the following item
Item
Inspection
Cycle of inspection
Fastening parts
Check whether the loose nuts and bear the appropriate plate.
Special attention to the pulley set screws.
Weekly
V-belt
Check and adjust the level of V-belt tension wheel
Weekly
Bearing
Rotation, respectively, all parts of the machine, check whether there is any abnormal sound.
Continuous operation for more than 10 minutes to check whether the site bearing abnormal temperature rise.
The anomaly of the bearings, should be replaced
Weekly
Huller blade
Wear a huller blade above 1 / 3 should be replaced
Every 3 months
Screen
Broken or deformed should be replaced
Every 3 months
Sand roll
12mm diameter Emery roller weared should be replaced
Every 3 months
Ⅷ. Replacement of wearing parts
1. replace Screen(see figure 6)
(1)unload the covers;
(2)take off 3 Screen-Frames;
(3)loose the plate of frame;
(4)unload the Screen-Frame;
(5)replace the sieve。
2. replace emery roller
After unload the Screen-Frame:
(1). Unload the flowrate controller
(2). Screw off the bolt , take off the thruster ( see figure 8)
(3). Take off the roller one by one. Then replace it
Figure 8. unloading of Emery roller
3. Replace huller blade (see figure 9)
Unload 3 sets of Screen-Frame covers first,
- (1) Turn off two knobs;
(2)unload the base plate,repalce the huller blade。
Figure 9. Replacement of huller blade
Ⅸ.Fault resolution
fault category
cause
resolution
Flow rete decreasing
- 1、 Feed valve blockage
- 2、 Thruster wearing;
- 3、 Emery roller wearing;
- 4、 Huller blade wearing;
- 5、 V-belt creep。
- 1、 Clean the foreign matter;
- 2、 Replace wearing parts;
- 3、 Replace Emery roller;
- 4、 Replace huller blade;
- 5、 Increase tension of V-belt
Broken rice increasing
- 1、 Low quality of material;
- 2、 High pressure;
- 3、 Clearance to small;
- 4、 Emery roller wearing
- 1、 Decrease flow rate&steelyard weight
- 2、 Decrease steelyard weight;
- 3、 Adjust the clearance to 6~8mm;
- 4、 Replace Emery roller 。
High temp.of outlet rice
- 1、 Low air volume
- 2、 Sieve、sand roll wear;
- 3、 Screen、Screen-Frame blockage。
- 1、 Check and adjust;
- 2、 Replace wearing parts;
- 3、 Clean the sieve。
Bad effect, not white enough
- 1、 Sieve、Screen-Frame wear
- 2、 Screen、Screen-Frame blockage;
- 3、 Too high capacity;
- 4、 V-belt creep。
- 1、 Replace wearing parts;
- 2、 Clean the sieve;
- 3、 Adjust the flow rate
- 4、 Increase tension of V-belt
Bad in bran-removing
- 1、 Screen、Screen-Frame blockage
- 2、 Cyclone system blockage;
- 3、 Low air pressure in cyclone system 。
- 1、 Clean the Screen;
- 2、 Clean the cyclone system;
- 3、 Adjust the air volume & air pressure
From the supplier
Ⅳ. Installation
1、Installation datum hole
Figure2. datum hole
2、The installation should be based on formation, firmly. Equipment installation at the end of 6-M16 foot pads correction with the level of Department to ensure that the level of the state machinery at the bottom, and then fastening nut anchor bolts.
3、 In order to facilitate maintenance and inspection, the machine is not less than four weeks should be 1m left of the space. 1.5m above the machinery space should be left in order to replace the bearings when the machine spindle can be removed from the top of the vertical. Figure 3.
Figure 3. Installation space of equipment
Ⅴ. The boot preparation
1, open the side of the machine base plate, according to the following checks:
(1) check the Triangle will be tight round the bolt, and each round of V-belt in the correct location.
(2) to check the degree of tension of the Triangle.
(3) Triangle with his hands moving slowly round plate, check whether indoor roller white foreign body, especially the metal debris. If so, be clear.
2, so that under no-load motor operation, according to the following checks:
(1) motor rotation direction, down from the previous observation, running clockwise Pulley.
(2) whether there is any abnormal noise machines and vibration.
(3) whether the overheated bearings throughout.
(4) whether the motor ammeter showed abnormal
3, air-conditioning
Equipment in the near vicinity of the wind pipe (see Figure 4), the user network to install wind suction bran should be made for air-flow valves. No-load test, the regulation of air volume, so that pressure gauge shows the value of the machine in the water column -100 ~-150mm range
Figure 4
Ⅵ. Operation
1, After the boot prepared , the startup procedures are as follows
Start bran-suction fan (be attention to the air volume)
2. Adjustment of the clearance in whitening room
The whitening pressure of whitening room in this machine is adjusted by the clearance between huller blade and sand roll ( Figure 5)
Figure 5. The clearance of huller blade and emery roll
Due to sand abrasion and the need to adjust the roll clearance can be removed to build the frame and the side cover, remove the screen and the framework (see Figure 6). Knob and then release the lock nut and rotating the knob to adjust the clearance between huller blade and sand roll. Increasing clearance clockwise rotation, counterclockwise rotation decreases clearance that can be used to check special 6mm feet measured (see Figure 7)
Figure 6. Adjustment of the clearance
Figure 7. Clearance measurement
Ⅶ. Repair and maintenance
1, regular cleaning of machine parts easily plot bran.
Parts
Cleaning period
Discharge hole
Everyday
Inside of covers
Weekly
Material outlet
Weekly
Bran-collection pipe
Monthly
2, periodic inspection machines easy to loose, wear parts, mainly in the following item
Item
Inspection
Cycle of inspection
Fastening parts
Check whether the loose nuts and bear the appropriate plate.
Special attention to the pulley set screws.
Weekly
V-belt
Check and adjust the level of V-belt tension wheel
Weekly
Bearing
Rotation, respectively, all parts of the machine, check whether there is any abnormal sound.
Continuous operation for more than 10 minutes to check whether the site bearing abnormal temperature rise.
The anomaly of the bearings, should be replaced
Weekly
Huller blade
Wear a huller blade above 1 / 3 should be replaced
Every 3 months
Screen
Broken or deformed should be replaced
Every 3 months
Sand roll
12mm diameter Emery roller weared should be replaced
Every 3 months
Ⅷ. Replacement of wearing parts
1. replace Screen(see figure 6)
(1)unload the covers;
(2)take off 3 Screen-Frames;
(3)loose the plate of frame;
(4)unload the Screen-Frame;
(5)replace the sieve。
2. replace emery roller
After unload the Screen-Frame:
(1). Unload the flowrate controller
(2). Screw off the bolt , take off the thruster ( see figure 8)
(3). Take off the roller one by one. Then replace it
Figure 8. unloading of Emery roller
3. Replace huller blade (see figure 9)
Unload 3 sets of Screen-Frame covers first,
- (1) Turn off two knobs;
(2)unload the base plate,repalce the huller blade。
Figure 9. Replacement of huller blade
Ⅸ.Fault resolution
fault category
cause
resolution
Flow rete decreasing
- 1、 Feed valve blockage
- 2、 Thruster wearing;
- 3、 Emery roller wearing;
- 4、 Huller blade wearing;
- 5、 V-belt creep。
- 1、 Clean the foreign matter;
- 2、 Replace wearing parts;
- 3、 Replace Emery roller;
- 4、 Replace huller blade;
- 5、 Increase tension of V-belt
Broken rice increasing
- 1、 Low quality of material;
- 2、 High pressure;
- 3、 Clearance to small;
- 4、 Emery roller wearing
- 1、 Decrease flow rate&steelyard weight
- 2、 Decrease steelyard weight;
- 3、 Adjust the clearance to 6~8mm;
- 4、 Replace Emery roller 。
High temp.of outlet rice
- 1、 Low air volume
- 2、 Sieve、sand roll wear;
- 3、 Screen、Screen-Frame blockage。
- 1、 Check and adjust;
- 2、 Replace wearing parts;
- 3、 Clean the sieve。
Bad effect, not white enough
- 1、 Sieve、Screen-Frame wear
- 2、 Screen、Screen-Frame blockage;
- 3、 Too high capacity;
- 4、 V-belt creep。
- 1、 Replace wearing parts;
- 2、 Clean the sieve;
- 3、 Adjust the flow rate
- 4、 Increase tension of V-belt
Bad in bran-removing
- 1、 Screen、Screen-Frame blockage
- 2、 Cyclone system blockage;
- 3、 Low air pressure in cyclone system 。
- 1、 Clean the Screen;
- 2、 Clean the cyclone system;
- 3、 Adjust the air volume & air pressure
About the supplier
Main products: Rice milling machine,Coffee pulper machine,Food and beverage processing machinery,Corn flakes processing line
- ✓Exhibited at 10 of the last 10 Canton Fairs
- ✓Manufacturer
- ✓Founded 2003
- ✓Canton Fair Premium Supplier
- ✓National high-tech enterprise
- Exhibited at 10 of the last 10 Canton Fairs
- Manufacturer
- Founded 2003
- Canton Fair Premium Supplier